AI for specification writing and coordination in engineering and architecture
When the specification and the drawings disagree, contractors price the more expensive reading or raise questions during construction, and the owner may treat the conflict as a design error. Unresolved editor's notes, references to withdrawn standards and products specified in two different ways all end up in the bid documents. Specifiers spend their time retyping and searching rather than judging. The cost appears later as RFIs, change orders and strained client relationships.