AI for drawing set quality control before issue
A callout pointing to a detail that does not exist, a sheet missing from the index or a revision that is clouded but not listed creates questions from contractors and reviewers. During tender these become addenda, and during construction they become RFIs and claims of design error. QC done in a rush late on the issue date catches some issues but leaves little record. The cost is reputation with clients and authorities and time spent answering avoidable questions.