AI for subcontract package preparation in construction procurement
Packages that miss flow-down terms leave the contractor carrying obligations that the subcontractor does not share. Scope written too loosely creates gaps between trades. Packages are copied from old projects with the wrong requirements. The cost is disputes, uncovered risks and slow buyout.